Deposit control
Malina CLARIS
An oil-soluble cleaning fluid that dissolves existing varnish off internal surfaces and holds it in solution until filtration removes it. Runs live, at treat rate, without an outage.
Malina Nig Ltd · Lagos, Nigeria
Oil and fuel do not fail because they run out. They fail because they oxidise, pick up water and particles, and lay down deposits on the surfaces that need them most. Malina measures what is actually in your systems, cleans it, and sources what the data says you need.
2×
Typical oil-life extension on systems held inside condition limits.
<15ΔE
Varnish potential we target after deposit control, measured to ASTM D7843.
72hrs
Turnaround on a full oil-condition panel, sample to signed report.
24/7
Standby response for critical rotating equipment nationwide.
01. The limits
These are the published condition limits a turbine or hydraulic charge is held to. The green line is the one that matters: cross it and the fluid has left normal service. No reading is plotted here, yours comes from your own sample.
< 15 ΔE
> 50 %
16/14/11
< 150 ppm
± 5 %
< 0.1
02. The failure nobody schedules
Thermal and oxidative stress breaks a lubricant down into degradation products. They stay dissolved while the oil is hot, then drop out on cool surfaces, servo valves, bearing journals, coolers, filters. By the time a unit trips, the deposit has been building for months.
Every one of those symptoms is measurable before it becomes an outage. That measurement is where a Malina programme starts.
03. The divisions
Oil and lubrication, fuel management, laboratory analysis, and technical procurement. Each stands alone. Run together they compound, the laboratory sets the intervention, and procurement makes sure what arrives on site is what the data called for.
Division 01
Condition monitoring, varnish and contamination control, additive replenishment and reliability consulting for turbine, hydraulic, compressor and gearbox systems.
The OilCycle programmeDivision 02
Fuel polishing and conditioning, tank cleaning, water and microbial control, and stored-fuel quality programmes for standby generation and process plant.
Fuel managementDivision 03
Sampling programmes and laboratory testing to published ASTM and ISO methods, trended against system-specific limits, with a named engineer on every report.
Analysis & laboratoryDivision 04
Specification, cross-referencing, vendor qualification and sourcing of lubricants, filtration hardware, instrumentation and spares, with the paperwork to prove origin.
Technical procurement04. Products
Nothing here is sold blind. Every product is dosed or sized against a current oil analysis, and re-measured after commissioning.
Deposit control
An oil-soluble cleaning fluid that dissolves existing varnish off internal surfaces and holds it in solution until filtration removes it. Runs live, at treat rate, without an outage.
Additive replenishment
An antioxidant and anti-wear package that rebuilds depleted additive chemistry in turbine, hydraulic and compressor oils, dosed to the RPVOT and RULER shortfall we measure.
Filtration skids
Kidney-loop purification carts and skids combining depth filtration, electrostatic deposit capture and vacuum dehydration. Sized to reservoir volume and installed live.
Monitoring
A scheduled sampling programme with a fixed test slate, trended limits and a named engineer, plus optional inline sensors for water activity, particle count and dielectric shift.
Dehydration
Vacuum and coalescing dehydration units for systems carrying free or emulsified water, plus desiccant breathers that stop humid air entering the reservoir in the first place.
Lubricants
Deposit-resistant turbine and hydraulic oils for new fills and full charge-outs, supplied with a baseline analysis certificate so trending starts from day one.
05. Industries
06. Results
Each engagement closes with a signed report: the condition data before, the intervention, and the condition data after.
Power generation · Gas turbine
42 → 11MPC ΔE, 90 days
A 2 500 litre turbine lube system running in the alarm band for varnish potential was brought back inside limits with live deposit-control dosing and kidney-loop filtration.
Oil & gas · Hydraulic power unit
18 → 3Valve faults per year
Repeat sticking on directional control valves traced to soft deposit and water ingress. Dehydration plus desiccant breathers on the reservoir removed the cause rather than the symptom.
Manufacturing · Compressor fleet
4 yrsCharge life, still in service
A fixed-calendar oil change schedule across a compressor fleet was replaced with condition-based change-out. Charges are now replaced on measured data, not on the calendar.
08. Why Malina
Humidity, dust load, grid instability and long lead times on imported spares all shorten lubricant life in ways a European service interval never accounts for. Malina Nig Ltd is registered with the Corporate Affairs Commission and operates from Lagos with field capability in the Niger Delta, so the response to a varnish alarm is measured in days, not shipping weeks.
The cheapest litre of turbine oil on any site is the litre already in the reservoir. Our job is to prove it is still fit for service, and to make it so when it is not.
Start with the data
One reservoir, one sample, one report. If the oil is fit for service we will tell you that and there is nothing to sell.